Show mobile menu
Show search control
Show search control
Search Site

Transport and infrastructure

Development Capacity Study

The Development Capacity Study was undertaken in 2008/9 and updated in 2010/11. 

  • Stage 1 examines the level and capacity of existing infrastructure services, facilities and accessibility
  • Stage 2 assesses the viability of development sites
  • Stage 3 looks at the potential impact of changes to the affordable housing targets

Stage 1 - Settlement appraisal (March 2011 update) [1MB]

Stage 2 report - Site appraisal (March 2011) [743KB]

Stage 2 Report - Site appraisal tables [562KB]

Stage 2 Report - Transport infrastructure costs (February 2010) [6MB]

Stage 3 Report - Affordable housing policy appraisal (March 2011 update) [444KB]

Transport and connectivity plans and studies

Read local transport plans and connectivity studies covering the Staffordshire Moorlands area.

Staffordshire Moorlands Infrastructure Plan 2016 [3MB]

Cheadle Town Centre - Phase 2 Assessment and Appendices [3MB]

Cheadle Town Centre Traffic Study [3MB]

Staffordshire Local Transport Plan 2011 [3MB]

Draft Staffordshire Moorlands Integrated Transport Study 2011 - 2026 [6MB]

North Staffordshire Connectivity Study 2010 [6MB]

Churnet Valley Accessibility and Connectivity Study [3MB]

Churnet Valley Transport Study [14MB]