Toggle Menu

Peak Cluster - Carbon Capture Pipeline Project

Information about Peak Cluster and the Carbon Capture Pipeline Project

Peak Cluster is a group of four local cement and lime producers who work together, along with other partner agencies, to reduce their carbon emissions. The Carbon Capture Pipeline project aims to create the infrastructure to capture, transport and permanently lock away the CO2 produced.

More information about this project can be found online at https://peakcluster.co.uk/

The council is not involved in this project and will not be determining the planning consent for this scheme as it is a Nationally Significant Infrastructure Project (NSIP), which will require a Development Consent Order (DCO) from the Secretary of State. Applications for DCOs for NSIPs are submitted to the Planning Inspectorate and not Staffordshire Moorlands District Council. They will examine the proposal and make a recommendation to the Secretary of State who is responsible for making the final decision, guided by National Policy Statements.

As part of the proposal falls within our administrative boundary, Staffordshire Moorlands District Council will be defined as a 'Host Authority'.  As a host authority, the Council have a role throughout the various stages of the process from pre-application to examination and post-consent, and we can assist in providing a local perspective to shape the NSIP proposals.

Our key responsibilities will include:

  • submitting a Local Impact Report to outline how a project affects the Staffordshire Moorlands
  • providing written representations and responding to any questions that the Planning Inspectorate may have
  • participating in Examination Hearings

if consented,

  • discharging any requirements on the consent, and
  • monitoring the works carried out to ensure compliance with the provisions in the DCO

There will also be, as a part of any DCO application, a large array of technical reports carried out by suitably qualified and experienced consultants covering all of the aspects of the development proposal including safety to long-term maintenance - these will be assessed by the Planning Inspectorate when they make their recommendations to the Secretary of State. 


Consultation

The next round of consultation for Peak Cluster will begin on 12 November and run until 18 December.

This latest stage of the project's design has been refined following integration of:

  • feedback received during the first phase of consultation
  • the results of ongoing technical studies, engineering assessments and environmental surveys.

The consultation covers:

  • updates to the area within which Peak Cluster proposes to build permanent infrastructure (known as the project boundary) which was shared in September
  • the proposed locations of above ground installations (AGIs), block valve stations (BVSs), and the temporary areas required for access and construction in most locations.

Here's how you can be involved:

Register to attend an event or webinar at www.peakcluster-consultation.co.uk.

To see the latest plans, find out more and take part in the consultation - including submitting your feedback - visit www.peakcluster-consultation.co.uk.

If you have any questions contact consultation@peakcluster.co.uk or call 0800 0129 167 (freephone)

Last modified on 12 November 2026